Informasi Umum

Kode

17.04.2882

Klasifikasi

C -

Jenis

Karya Ilmiah - Skripsi (S1) - Reference

Subjek

Lean Manufacturing

Dilihat

189 kali

Informasi Lainnya

Abstraksi

Waste is activity that uses resources such as time and cost but does not add value to the activity. One of the types of waste is transportation waste. Through observation, transportation waste is found in assembly department of Panzer A. In order to prevent similar occurrences in the future, the waste needs to be minimized by lean manufacturing approach. The study began by collecting and processing the data which are data of existing layout of assembly department, material handling equipment, transportation time, dimension of facilities in existing layout, cycle time of assembly process, and assembly process flow. The data will be used to map existing condition by using current state mapping which consists of a value stream mapping and process activity mapping. Then to identify the causes of transportation waste, the tools used are fishbone diagram. After the cause of waste is identified, an improvement is designed with layout and facility planning to minimize the waste.

Keywords: Lean manufacturing, Transportation waste, Value Stream Mapping, Process Activity Mapping, layout and facility planning.

  • IE4424 - TUGAS AKHIR
  • IEH4CB3 - LEAN SIX SIGMA
  • IEI4R3 - LEAN SIX SIGMA

Koleksi & Sirkulasi

Tersedia 1 dari total 1 Koleksi

Anda harus log in untuk mengakses flippingbook

Pengarang

Nama CUT VADEA AQILA
Jenis Perorangan
Penyunting AGUS ALEX YANUAR, MELDI RENDRA
Penerjemah

Penerbit

Nama Universitas Telkom
Kota BANDUNG
Tahun 2017

Sirkulasi

Harga sewa IDR 0,00
Denda harian IDR 0,00
Jenis Non-Sirkulasi