19.04.3062
658.5 - Management of production, Production management in manufacturing enterprises, Production managmeent in service industries, Comprehensive works on logistics
Karya Ilmiah - Skripsi (S1) - Reference
Production Planning
101 kali
In manufacturing operations, fulfilling the demand by the due dates is one way to keep customer satisfaction level. If the demand was delivered after the due dates, the tardiness penalty was occured due to maintain the customer satisfaction level. Scheduling was needed to reduce the tardiness that may occur in manufacturing operations. The production scheduling system in part fabrication is considered identical parallel machine scheduling due to several machine with same capabilites and characteristic. Thus in order to get optimal solution to minimize tardiness, this research used the genetic algorithm as method to minimize the total tardiness. The proposed schedule minimize the total tardiness by 78,4% from 2584 hours to 557,6 hours.
Seluruh 1 koleksi sedang dipinjam
Nama | MUFLIH HAFIDZ DANURHADI |
Jenis | Perorangan |
Penyunting | DIDA DIAH DAMAYANTI, WIDIA JULIANI |
Penerjemah |
Nama | Universitas Telkom, S1 Teknik Industri |
Kota | Bandung |
Tahun | 2019 |
Harga sewa | IDR 0,00 |
Denda harian | IDR 0,00 |
Jenis | Non-Sirkulasi |