Informasi Umum

Kode

19.04.3062

Klasifikasi

658.5 - Management of production, Production management in manufacturing enterprises, Production managmeent in service industries, Comprehensive works on logistics

Jenis

Karya Ilmiah - Skripsi (S1) - Reference

Subjek

Production Planning

Dilihat

101 kali

Informasi Lainnya

Abstraksi

In manufacturing operations, fulfilling the demand by the due dates is one way to keep customer satisfaction level. If the demand was delivered after the due dates, the tardiness penalty was occured due to maintain the customer satisfaction level. Scheduling was needed to reduce the tardiness that may occur in manufacturing operations. The production scheduling system in part fabrication is considered identical parallel machine scheduling due to several machine with same capabilites and characteristic. Thus in order to get optimal solution to minimize tardiness, this research used the genetic algorithm as method to minimize the total tardiness. The proposed schedule minimize the total tardiness by 78,4% from 2584 hours to 557,6 hours.

  • BUG1D2 - BAHASA INGGRIS I
  • DU1132 - BAHASA INGGRIS I (ACADEMIC WRITING)
  • BUG1E2 - BAHASA INGGRIS II
  • HUG1I2 - KONSEP PENGEMBANGAN SAINS DAN TEKNOLOGI
  • IE2343 - PENELITIAN OPERASIONAL II
  • DU1203 - PENGANTAR ILMU DAN TEKNOLOGI
  • IEG2D3 - PERANCANGAN KERJA DAN ERGONOMI + PRAKTIKUM
  • IEG3D4 - PERENCANAAN DAN PENGENDALIAN PRODUKSI + PRAKTIKUM
  • IEG2G3 - PROSES MANUFAKTUR DAN PRAKTIKUM
  • IEH4H4 - TUGAS AKHIR
  • III4A4 - TUGAS AKHIR
  • III4A4 - TUGAS AKHIR

Koleksi & Sirkulasi

Seluruh 1 koleksi sedang dipinjam

Anda harus log in untuk mengakses flippingbook

Pengarang

Nama MUFLIH HAFIDZ DANURHADI
Jenis Perorangan
Penyunting DIDA DIAH DAMAYANTI, WIDIA JULIANI
Penerjemah

Penerbit

Nama Universitas Telkom, S1 Teknik Industri
Kota Bandung
Tahun 2019

Sirkulasi

Harga sewa IDR 0,00
Denda harian IDR 0,00
Jenis Non-Sirkulasi