IDENTICAL PARALLEL MACHINE SCHEDULING USING GENETIC ALGORITHM TO MINIMIZE TOTAL TARDINESS FOR CNC 4 AXIS IN PT DIRGANTARA INDONESIA (PERSERO)

MUFLIH HAFIDZ DANURHADI

Informasi Dasar

135 kali
19.04.3062
658.5
Karya Ilmiah - Skripsi (S1) - Reference

In manufacturing operations, fulfilling the demand by the due dates is one way to keep customer satisfaction level. If the demand was delivered after the due dates, the tardiness penalty was occured due to maintain the customer satisfaction level. Scheduling was needed to reduce the tardiness that may occur in manufacturing operations. The production scheduling system in part fabrication is considered identical parallel machine scheduling due to several machine with same capabilites and characteristic. Thus in order to get optimal solution to minimize tardiness, this research used the genetic algorithm as method to minimize the total tardiness. The proposed schedule minimize the total tardiness by 78,4% from 2584 hours to 557,6 hours.

Subjek

PRODUCTION PLANNING
 

Katalog

IDENTICAL PARALLEL MACHINE SCHEDULING USING GENETIC ALGORITHM TO MINIMIZE TOTAL TARDINESS FOR CNC 4 AXIS IN PT DIRGANTARA INDONESIA (PERSERO)
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

MUFLIH HAFIDZ DANURHADI
Perorangan
DIDA DIAH DAMAYANTI, WIDIA JULIANI
 

Penerbit

Universitas Telkom, S1 Teknik Industri
Bandung
2019

Koleksi

Kompetensi

  • BUG1D2 - BAHASA INGGRIS I
  • DU1132 - BAHASA INGGRIS I (ACADEMIC WRITING)
  • BUG1E2 - BAHASA INGGRIS II
  • HUG1I2 - KONSEP PENGEMBANGAN SAINS DAN TEKNOLOGI
  • IE2343 - PENELITIAN OPERASIONAL II
  • DU1203 - PENGANTAR ILMU DAN TEKNOLOGI
  • IEG2D3 - PERANCANGAN KERJA DAN ERGONOMI + PRAKTIKUM
  • IEG3D4 - PERENCANAAN DAN PENGENDALIAN PRODUKSI + PRAKTIKUM
  • IEG2G3 - PROSES MANUFAKTUR DAN PRAKTIKUM
  • IEH4H4 - TUGAS AKHIR
  • III4A4 - TUGAS AKHIR
  • III4A4 - TUGAS AKHIR

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini