Sentiment Analysis Of Development Jakarta-Bandung High-Speed Train Using Twitter Social Media With BNN Method

ARYA PRATAMA ANUGERAH RAHMADYAN

Informasi Dasar

90 kali
23.04.1048
006.312
Karya Ilmiah - Skripsi (S1) - Reference

The Jakarta-Bandung high-speed train is one of the infrastructure development projects currently being carried out by the Indonesian government. The project is a large project that requires a long processing time and very large costs. Therefore, infrastructure development has reaped a lot of public opinions, both positive and negative. The purpose of writing this Final Project is to analyze sentiment on public opinion about the construction of the Jakarta-Bandung high-speed train. With data sourced from Twitter social media, the data will be analyzed in three classes, namely positive, negative, and neutral classes where the weighting will use the TFIDF. The classification method used in this study is the Backpropagation Neural Network method. The best results were obtained in this study using a hyper tuning scenario with an accuracy of 74.56%.

Subjek

DATA MINING
DATA ANALYSIS,

Katalog

Sentiment Analysis Of Development Jakarta-Bandung High-Speed Train Using Twitter Social Media With BNN Method
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

ARYA PRATAMA ANUGERAH RAHMADYAN
Perorangan
Yuliant Sibaroni
 

Penerbit

Universitas Telkom, S1 Informatika
Bandung
2023

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini