PERANCANGAN ARSITEKTUR JARINGAN FIBER TO THE BUILDING (FTTB) DENGAN TEKNOLOGI GIGABIT ETHERNET PASSIVE OPTICAL NETWORK (GEPON) DI NATIONAL BRAIN CENTRE CAWANG

AGHNIA BELLA DINA

Informasi Dasar

111091057
621.382 16
Karya Ilmiah - Skripsi (S1) - Reference

ABSTRAKSI: ABSTRAK Kebutuhan akan pelayanan di bidang teknologi informasi dan komunikasi semakin meningkat setiap tahun. Jenis layanan yang dibutuhkan bukan lagi sebatas voice namun menjadi berkembang ke layanan triple play (voice, data, dan video). National Brain Centre Hospital Cawang sebagai salah satu rumah sakit pionir brand check up di Indonesia didorong mempunyai layanan tekonlogi fully broadband yang menunjang layanan tripleplay untuk kebutuhan security, informasi dan komunikasi.

Pada Tugas Akhir ini dilakukan perancangan arsitektur fiber to the building (fttb) menggunakan teknologi GEPON di National Brain Centre Hospital Cawang, agar dapat memenuhi layanan triple play. Perancangan ini dimulai dengan mengumpulkan informasi data bangunan dan permintaan service pelanggan National Brain Centre Hospital Cawang. Kemudian dari hasil pengumpulan informasi dilakukan perancangan jaringan FTTB dengan menentukan spesifikasi perangkat, jumlah perangkat, dan letak perangkat. Setelah itu akan dianalisis hasil perancangan jaringan FTTH tersebut berdasarkan LPB , RTB , packet loss, dan delay.

Setelah dilakukan perancangan di NBC Hospital dapat diimplementasikan 4 buah ODC/Main POS, 8 ODP/Sub POS dan 48 buah ONU dengan 4 unit splitter 1:4 dan 8 unit splitter 1:8. Sedangkan berdasarkan perhitungan kelayakan sistem link Power Budget didapatkan redaman total pada jarak terjauh sebesar 26.09658524 dB untuk downlink dan 26.32581865 dB untuk uplink. Hal ini masih berada dalam toleransi yang ditetapkan IEEE803.2ah sebesar 29 dB. Hasil uji Rise Time Budget yaitu untuk arah downlink pada pelanggan terjauh menghasilkan total waktu sebesar = 0.367845616 ns. Waktu tersebut masih berada dibawah nilai waktu sistem NRZ sebesar 0.56 ns. Untuk arah uplink pada pelanggan terjauh menghasilkan waktu total sebesar = 0.372640701 ns. Waktu tersebut masih berada dibawah nilai waktu sistem NRZ sebesar 0.56 ns. Hasil uji performansi sistem S/N sebesar 27.43357345 dB yang menghasilkan BER sebesar 2.92437 X 10-32 . Hal ini masih berada dalam toleransi karena BER ideal sebesar 10-9.Kata Kunci : FTTB, GEPON, Power Link Budget, Rise Time Budget, BER, Packet Loss, DelayABSTRACT: ABSTRACT The need of services in the field of information and communication technology is increasing every years. The type of required services is no longer limited to the voice but being develop into triple play services (voice, data, and video). National Brain Centre Hospital Cawang as one of the pioneer hospital check-up brand in Indonesia has driven technology services that support fully broadband services tripleplay for the security needs, information and communication.

In this final project will be designed the architecture of fiber to the building (FTTB) using GEPON technology at the National Brain Centre Hospital Cawang, in order to fulfill triple play services. The design started with gathering information of data building and customer service requests at National Brain Centre Hospital Cawang. Then the results of the information gathering will be designed FTTB networks by specifying the devices, device number, and the location of the devices. After that it will analyzed the results of the FTTH network design based on LPB, RTB, packet loss, and delay.

delay. After designing in NBC Hospital , it can be implemented by 4 ODC/Main POS, 8 ODP/Sub POS, and 48 ONU with 4 splitter units 1:4 and 68 splitter units 1:8. Whereas, according to the value of feasibilty Link Power Budget System it can be found total of attentuation at the longest distance as big as 26.09658524 dB for downlink and 26.32581865 dB for uplink. And it still within tolerance which specified by IEEE803.2 ah at 29 dB. Budget Rise Time test values for downlink direction at farthest cotsumer indicate period total at 0.367845616 ns. The Period still in under value period of NRZ system which is at 0.56 ns. For the uplink direction at the farthest cotsumer produce period total = 0.372640701 ns. And This period still in below of value period in NRZ System which is at 0.56 ns. The value of the Performance test in S/N System at 27.43357345 dB which produce BER at 2.92437 X 10-32.. And this value still in tolerance limit for BER Ideal at 106 .Keyword: FTTB, GEPON, Power Link Budget, Rise Time Budget ,BER, Packet Loss, Delay

Subjek

Transmisi Telkom
 

Katalog

PERANCANGAN ARSITEKTUR JARINGAN FIBER TO THE BUILDING (FTTB) DENGAN TEKNOLOGI GIGABIT ETHERNET PASSIVE OPTICAL NETWORK (GEPON) DI NATIONAL BRAIN CENTRE CAWANG
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

AGHNIA BELLA DINA
Perorangan
Rendy Munadi , Akhmad Hambali
 

Penerbit

Universitas Telkom
Bandung
2013

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini