Komparasi Metode PERT Dibandingkan Dengan Metode Time Plan untuk Penjadwalan Waktu Kontrak Proyek Implementasi Rectifier Tahun 2013 Dalam Pengelolaan Divisi Proyek PT Hariff Daya Tunggal Engineering

VINDA RAHMADIANTI SAVITRI

Informasi Dasar

92 kali
14.04.643
658
Karya Ilmiah - Skripsi (S1) - Reference

This research was conducted to analyze the efficiency of “Time contract’s accomplishment” owned by PT Hariff where main job is installing rectifier unit, by comparing completion of project’s schedule which originally using a “Time plan” method versus using PERT methods. The first aim is to find out how conformity the “Time plan” method to control completion of the contract during completion of the project. In the study which became a staple of discussion was comparing the method of the time plan which has been adopted by PT Hariff, PERT. PERT is a calculation is made to assist the manager to perform scheduling, monitoring and control of large projects and with complexity using 3 estimated time those are optimistic, realistic and pessimistic. The research method used is the analysis method that is applied research conducted to solve specific problems that are being experienced by the company. As well as a descriptive quantitative which technical research that does not make the comparison of variables with other variables in the sample. The results obtained by the calculation of the time contract is recalculated using PERT methods, produces a small calculation where probability of project completion, although the number of contacts to be more closer to yhe number of days of project completion. In addition to implementation of this PERT methods is leading company having an easier control to the progress of the project, and to be more aware of activity in term of critical path, which should be on a high particular concern. Key words: analysis Project Scheduling, project management, PERT

Subjek

OPERATION MANAGEMENT
 

Katalog

Komparasi Metode PERT Dibandingkan Dengan Metode Time Plan untuk Penjadwalan Waktu Kontrak Proyek Implementasi Rectifier Tahun 2013 Dalam Pengelolaan Divisi Proyek PT Hariff Daya Tunggal Engineering
 
55p.: pdf file.; daftar pustaka + lam.
 

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

VINDA RAHMADIANTI SAVITRI
Perorangan
Retno Setyorini, ST., MM
 

Penerbit

Universitas Telkom, Ilmu Administrasi Bisnis
 
2014

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini